Try for free

Bring every part of your project together.

Give every team a shared view of what matters. Plan the work, see how it connects, and turn project knowledge into better decisions, with people and AI working from the same structure.

Live

Plan

Systems, components, the work on them, the people and their AI: everything that runs a project, today.

Coming soon

Visualize

2D drawings, a connected work canvas and BIM, every system in view where it is.

Coming soon

Intelligence

Dashboards and data views from live project data, shared with anyone, and the learnings of every project.

Plan

Everything that runs a project, on one structure: in four parts.

One structure. The whole project connected.

Connect systems, people and project data from day one. Every requirement, test and decision adds to a shared picture that the whole team and their AI can work from.

Every system becomes a shared workspace.

Open any system and see the work, documents and conversations that belong to it. One connected history, from the first requirement to operation.

Ask your AI

“Build the system list for Building B from these tender documents.”

It works in Systems with your access, and its work is marked as AI.

Your code standard

NS 3451, TFM or your company’s own codes, from the first day.

One tree, every level

From chapters down to single components, with what is under each in view.

No loose ends

Every piece of information belongs to a system, so it is always found where it should be.

One TFM master for every component type.

Component types, TFM codes and what each type needs, kept once for the whole project and attached to the systems they serve.

Ask your AI

“Which component types have no checklist template yet?”

It works in Components with your access, and its work is marked as AI.

Tags that match the site

TFM tags follow the project’s pattern, so the labels on site, in the model and in the O&M files agree.

Types carry what they need

Requirements, checklist templates and required documents, set once per component type.

BIM object sync, coming

Match model objects that carry the same component codes, and keep them in step.

Every system in its place.

Buildings, floors and rooms in one tree. Place a system or a component, and its location goes with it, so everyone on site knows where to find it.

Ask your AI

“Place every system on Plan 2 of Building B in its room, from the drawings.”

It works in Locations with your access, and its work is marked as AI.

Places inside places

Buildings, floors, rooms and areas, nested as deep as the project needs, in the order you drag them into.

What is where

Each place shows how many systems and components sit in it, and in everything below it.

The location beside the code

A placed system carries its location, such as +Bygg B/Plan 2, wherever it shows up.

Every requirement, with its full history.

Requirements written on the systems, components and integrations they govern, with every change shown in redline: who added what, who removed what, and when.

Ask your AI

“What changed in the ventilation requirements since the tender?”

It works in Requirements with your access, and its work is marked as AI.

Where they apply

On the system, component type or integration they govern, not in a separate binder.

Redline history

Compare revisions, with every addition and deletion signed by person and company.

Always the latest revision

The team and their AI automatically work from the latest revision. Earlier versions stay available, with every change in context.

The work, on the systems it belongs to.

Progress, checklists, integrations, responsibilities, documents, punch items and scheduling, each tied to a system or a component.

See every system’s maturity at a glance.

Every system through your phases and MMI levels on one grid, from basic information to operation, across every company on the project.

Ask your AI

“Which systems in Building B are still below MMI 400?”

It works in Progress with your access, and its work is marked as AI.

Your maturity model

MMI and FMI out of the box, or your own phases and levels.

Progress lives on the system

Not in a status report. Update the system and everyone sees it.

Filters that match the site

By chapter, location, company or phase, top-down or one system in depth.

Tests and inspections, prepared once and signed off everywhere.

Checklists from templates or written with AI, each with a builder, a performer and QA, followed from draft to approved on the system it belongs to.

Ask your AI

“Create functional test checklists for every AHU, based on the requirements.”

It works in Checklists with your access, and its work is marked as AI.

Roles built in

Builder, performer and QA on every checklist, so nobody signs off their own work.

Evidence attached

Protocols, photos and measurements on the item they prove.

Templates and AI

Start from a template, or let your AI draft them from the requirements.

Every interface between systems, specified and tested.

The interfaces between trades, alive: each integration links two systems, carries its own specification and owner, and gets tested, so nothing falls between companies.

Ask your AI

“Read the fire strategy and create every integration it implies.”

It works in Integrations with your access, and its work is marked as AI.

Specifications with revisions

Write the interface once. Every change is a new revision, not a new email.

Integrated tests

Checklists per integration, with the result on both systems.

Both sides, one click

Jump between the two systems an interface connects.

Who does what, per system, per company.

A living responsibility matrix: companies as groups, roles as codes and people on systems, carried down the tree so nothing is left unassigned.

Ask your AI

“Set up the responsibility matrix from this contract appendix.”

It works in Responsibilities with your access, and its work is marked as AI.

One group per company

Access, interfaces and invitations follow the company.

Carried down

Assign once on a chapter, and every system and component below inherits it.

Plan before they join

Placeholders for people who are not invited yet.

The documentation matrix that shows what is missing.

Every document filed per system and NS 3456 category, with revisions and status codes, so the documentation is complete before anyone asks.

Ask your AI

“Sort these O&M files into the right systems and categories.”

It works in Documents with your access, and its work is marked as AI.

Requirements per system

The matrix says what each system needs, from day one.

Revisions and status codes

Know which version is current and whether it is approved.

Sorted by your AI

Upload a folder and your AI files every document on its system and category.

Defects that close, not linger.

Punch items pinned to systems and components, assigned to the responsible company, prioritised and tracked to done.

Ask your AI

“Turn these walk-through notes into punch items.”

It works in Punch items with your access, and its work is marked as AI.

Priorities your way

Name and colour your own priority levels.

Assigned by responsibility

Punch items go to the company that owns the system, never to the wrong trade.

Overdue, automatically

Open, in progress, completed, and overdue the moment the date passes.

Plan tests with dependencies that respect reality.

Put checklists on a timeline, link what depends on what, and see what is unscheduled before it becomes late.

Ask your AI

“Plan the fire scenario tests for week 42 in the right order.”

It works in Scheduling with your access, and its work is marked as AI.

Dependencies

Sprinkler flow switch before fire alarm, fire alarm before AHU stop.

Nothing unplanned in hiding

Every checklist is on the plan or on a backlog you can see.

Days to months

This week’s tests or the whole commissioning phase.

Everyone finds the same answer.

Chat, search and the Log keep every conversation, answer and change where the whole team can find them, their AI included.

A conversation on everything.

Chatrooms for the project, direct messages for quick questions, and a thread on every system, checklist, document, integration and punch item, with the history kept for whoever comes next.

Ask your AI

“Summarise everything said about =365.001 this month.”

It works in Chat with your access, and its work is marked as AI.

Chatrooms and direct messages

Rooms for the project, a trade or a week of commissioning, and anyone one click away.

Tag anything

Mention people and tag systems, documents or punch items. Tags become links, and links become history.

Threads on the work

Every system, checklist and punch item has its own conversation.

Every change, on record.

Who changed what and when, on every system, whether it was a person or an AI. Open any system and read its full story.

Ask your AI

“What changed on =562.001 in the last 30 days, and who changed it?”

It works in Log with your access, and its work is marked as AI.

The full story

Every system’s history in order, from the first sketch.

People and AI, told apart

Every change made by an AI is marked as AI.

Yours to keep

The record goes with the building, not with the contract.

Set up the way your project works.

Project settings, exports and your own AI, so SystemTracker fits your company instead of the other way round.

Shape the project to how you work.

Modules, steps, code standards, statuses, priorities, role codes and locations: set them up for the project, and change them mid-project without losing anything.

Ask your AI

“Set up this project like our last hospital project, with NS 3451 and TFM.”

It works in Project settings with your access, and its work is marked as AI.

Your phases and levels

Rename, add and reorder steps, with the levels inside each.

Your codes and colours

Document statuses, punch priorities and role codes, named the way your team says them.

Change it any time

Everything already in the project keeps its place.

Take everything out. Any time. One click.

Export any part of the project in the structure you built: PDF, Excel, or a ZIP that mirrors your system tree. No asking, no fees, no lock-in.

Ask your AI

“Which systems would arrive as empty folders in the handover ZIP today?”

It works in Export with your access, and its work is marked as AI.

In the structure you built

Every export follows your system tree, so the files make sense without SystemTracker.

Every list, in system order

Systems, components, integrations, responsibilities and punch items, in Excel.

Gaps you can see

Anything missing in your data shows up in the export, from documents and checklists to responsibilities and punch items, before anyone else spots it.

Every module, open to your AI.

Connect the AI you already use. It works in every module through MCP, with your access, and every change it makes is marked as AI.

No token bundles

Bring your own agents and the workflows you have built. No AI tokens to buy from us.

Your assistant, your choice

Bring any MCP-ready assistant or agent, and swap any time.

Your permissions, no more

It sees and changes only what you may.

Marked as AI

Everyone sees what was done by an AI, and on whose behalf.

Coming soon

Visualize

See every system where it is: on the drawings, on the model and on one canvas the whole team works on.

  • 2D drawings that know your systems
  • A connected work canvas
  • BIM, connected to every system
Coming soon

Intelligence

Ask for the numbers you need. Dashboards and data views from live project data, shared with anyone, and the learnings of every project.

  • Dashboards from a prompt
  • Shared with the team, and outside
  • A platform for what you learn
Coming soon

Let every project make the next one better.

We are building organisational intelligence: find the people who make a difference, understand the patterns across projects and put shared experience to work.

Learnings

Get insights from earlier projects, connected to the decisions, tests and results behind them.

Lesson learnedFjordbyen Campus · Handover

Test the fire dampers against the fire alarm before the full-scale test.

Two dampers did not close on the day, and the test moved a week. On the next project the interface test ran three weeks earlier.
=542.001=362.001Used on two projects since

Keep experience in the company.

Preserve why decisions were made and what happened next, even when people change roles or a project ends.

Shared experience

Why we tested the interfaces earlier.

The decision, its context and the outcome, kept together.
Test resultsDecisionsConversations

Find the people who move projects forward.

Discover strong teams and companies, recognise the people who help others, and bring their experience into new projects.

Kari NordNordvent AS
Flags issues early
Spots missing access panels=362.001
Checks airflow against requirements=365.001
Magnus LieBygg Nord AS
Connects the disciplines
Coordinates fire and ventilation=542.001
Follows up interface tests=562.001

Spot recurring problems earlier.

Find patterns in delays, test failures and product issues across projects, with the context needed to understand them.

Recurring product issues
Repeated delays
The reasons behind the pattern

Carry good practice further.

Find what successful projects have in common and share proven approaches across teams, projects and countries.

Earlier interface checks
Clear responsibilities
Shared across projects

Plan with better evidence.

Compare tender assumptions and forecasts with actual delivery. Use the differences to improve the next estimate and plan.

=36Air handling
Planned
Delivered
Bring actual outcomes into the next plan.

Illustrative previews of upcoming features.